Realization of the flat Barrandov, Prague 5, 2012-2013, CZ

please edit! thx

1VF-Preparation and brief, strategy RIBA CKA

  • 201311_STU04_obklad_svetla_kuchyn_dvere_BEZ_20130823
  • 201311_Barrandov_DPS_MAL_LODZIE_20130730

4VF-Urban permission / Developed design CKA RIBA

  • 201311_Barrandov_ZSS_20130503

5VF-Technical design RIBA CKA

  • 201311_Barrandov_DPS_MAL_BUC_sanitaelektro20130706

    8VF-Author's supervision, Handover CKA RIBA

    • 201311_NEMEC_ATD_PRAHA_BEZ_BUC_20131011
    • 201311_NEMEC_ATD_PRAHA_BEZ_BUC_20131029
    • 201311_NEMEC_ATD_PRAHA_BEZ_BUC_20131111